Our Surveying team is a member of the St. Lucie County Development Review Committee and reviews all boundary surveys, topographic surveys, and plats that are associated with site development. The countys zoning code includes a mapped mandatory form-based overlay zone (4.04.00). Detached accessory buildings have different . It includes six transect zones all with different permissible land uses, form standards, building frontage types, faade design standards, parking standards, and landscaping standards. Animal Services (Pet licensing, adoptions), Volunteer Opportunities For Health & Human Services, Office of Wildfire Preparedness and Resilience, Housing, Community and Economic Development, El Dorado County Transportation Commission, El Dorado Hills Community Services District, Redevelopment Successor Agency Countywide Oversight Board, Septage Haulers and Portable Toilet Services, Skip to Department Navigation if it Exists, Septic System Minimum Setback Requirements, From lake or reservoir used for drinking water, From lot lines, roads, driveways, or buildings, Shall not be placed under asphalt, concrete, or under areas subject to vehicular traffic, From streams, springs, lakes, or reservoirs, From well or spring used for domestic purposes, Shall not be installed in areas subject to high groundwater tables. Corner lots fall under different setback rules. Product Approval Affidavit. Sec. Icard, Merrill, Cullis, Timm, Furen & Ginsburg, P.A. The code also includes a section of supplemental design standards intended to facilitate the commercial generation and distribution of solar power and the use of on-site solar energy systems in the unincorporated County (Sec. The St. Lucie County Planning and Development Services Department is a comprehensive one stop shop for building and development; where you can gain access to an elite group of staff ( click here for staff listing) working together to help build a community that is safe, economically sound, and united with local municipalities and surrounding Note: Under Florida law, e-mail addresses are public records. The proposed fence shall meet the side, front, and/or rear setback requirements when abutting a public right-of-way as defined in subsections(C), (D) and (E) (5) . For solar energy systems, roof-mounted systems are exempt from building height requirements and must be set back 2 feet from the roof edge; building-integrated systems are limited to 10 feet above maximum height limits; and ground/pole-mounted systems must be located in side and rear yards if possible and may encroach into required setbacks. Chapter VII. Comprehensive design criteriaand standards forwater, wastewater, and reclaimed water systems within theSt. Lucie County Utility Service Area. West Palm Beach, FL 33406, Minor Violations 120.695 Certification Letter June 30, 2017 [PDF], Water Well Contractor Licensing FAQs [PDF], Well Construction Grouting Information [PDF], Well Construction Section, Township and Range Fact Sheet [PDF], Water Management Districts of Florida Map [PDF], Well Construction Property Appraiser Website List [PDF], City of Stuart Surficial Aquifer Restriction Ordinance 1994 [PDF], FDEP Water Well Construction Disciplinary Guidelines and Citation Dictionary, New Potable Water Well Permitting in Delineated Areas (FDEP 62-524), Underground Injection Control (FDEP 62-528), Water Well Contractor Licensing Requirements (FDEP 62-531), Water Well Permitting and Construction Requirements (FDEP 62-532), Drinking Water Standards, Monitoring and Reporting (FDEP 62-550), Permitting, Construction, Operation, and Maintenance of Public Water Systems (FDEP 62-555), Underground Storage Tank Systems (FDEP 62-761), Regulation of Wells (FL Statutes 373 Part III), Public Health: General Provisions (FL Statutes, Chapter 381), Repair or modification of an existing well, Test holes that will be converted to a water use well. More information can be found on the Consumptive Water Use Permits page. 7.04.04. frontage and depth requirements, minimum lot size, minimum curb-cut separation, maximum height, and rear yard requirements for each individual conversion area. Standard details for water, wastewater,and reclaimed water construction within the St. Lucie County Utility Service Area. setbacks are to be measured. Fax: 312-786-6700, Membership for Allied Professionals & Citizens, Education, Work, and Experience Verification, https://www.municode.com/library/fl/st._lucie_county/codes/land_development_code. 158.203. SUPPLEMENTARY USE REGULATIONS 158.216. A permit is required prior to the construction of all new wells and the repair, modification or abandonment of an existing well regardless of the size. Article I. The top of the well casing shall terminate above grade and above known levels of flooding caused by drainage or runoff from surrounding land. 7.04.04. line dimension from centerline shall be in accordance with dimensions shown on the Solar generation stations require major site plan submission with a conditional use permit. Sec. DocHub User Ratings on G2. Base Building Line Setback Requirements. port st lucie shed setback requirements st lucie county building codes st lucie county fence regulations st. lucie county permit fees port st lucie city ordinances st lucie county planning and zoning Create this form in 5 minutes! 158.202. AREA, YARD, HEIGHT, AND OPEN SPACE REQUIREMENTS, Chapter VII. The St. Lucie County, FL is not responsible for the content of external sites. The St. Lucie County Surveying team performs or provides management for field surveys, including control, topographic, stormwater, design, right of way, environmental, and acquisition surveys. An application for a WUP can be submitted via the ePermitting Home page by selectingApplication Submittals/New, Modify, Renew. All surveys submitted to St. Lucie County must reference N.A.V.D 1988 for orthometric heights. The County will no longer accept assumed elevations on any type of survey submitted to the County.
Minimum horizontal separation distance between well and: Any sewer line (sanitary, industrial, or storm; main or lateral), Watertight septic tank or subsurface sewage leaching field. Site Map |
The term "building setback" means the required separation between a lot line (and/or right-of-way line) and a building or structure. Revision Sheet - Residential Misc. The requirements of this section shall not apply to those residential lots wherein a residential fence otherwise . 7.10.28). . You will need a Well Construction Permit for: An application for a water well construction, repair, modification or abandonment permit in Monroe County, Charlotte County, and for wells 12" or greater in diameter in Broward County can be submitted via the ePermitting Home page by selectingApplication Submittals/Water Well Construction. (A) General Provisions. Each separately landscaped area shall contain a minimum of one hundred eighty (180) square feet and shall have a minimum width of at least ten (10) feet and shall include at least one (1) shade tree of an appropriate species with the remaining area adequately landscaped with shrubs, ground cover, or other authorized landscaping material not to GIS NEWS
- Setback Required from Natural Body of Water. 7.10.28.A). Wells should be located outside areas of flooding. Code Setbacks, lot size and open space (Table 7-10) | St. Lucie County, FL Service Finder You are now exiting the St. Lucie County, FL. Primary-use Solar Generation Stations are conditional uses in agricultural and utility districts; Solar Energy Systems are permitted as accessory uses in all districts (Sec. 158.204. Website Design by Granicus - Connecting People and Government. DEVELOPMENT DESIGN AND IMPROVEMENT STANDARDS, Appendix 7.04.00. Lower fences (4 Feet or smaller) are the general rule for front yards. - Base Building Line Requirements. Please enable JavaScript in your browser for a better user experience. The Planning Division oversees current and long range planning functions within unincorporated St. Lucie County. Revision Sheet - Commercial. This includes all site plan applications for development over 6,000 square feet, conditional use permits and zoning, text amendments to the Land Development Code and Comprehensive Plan, and Future Land Use map amendments St. Lucie County, FL | Home Service Finder I WANT TO. - Special Design Requirements for Single-Family Residences. The St. Lucie County Surveying team is responsible for providing a wide range of surveying services. a thoroughfare right-of-way from centerline is greater than the base building line Your browser does not support inline frames or is currently configured not to display inline frames. 2014 St. Lucie County, Florida, All rights reserved and other copyrights apply. BUILDINGS AND BUILDING REGULATIONS. Setbacks vary by zoning district, and there are numerous exceptions to accommodate a variety of particular lot circumstances. 9.5. Copies of previous surveys are available to the public and are filed according to section, township, and range. Base Building Line Information Chart. - Setback Requirement for Corner Lot in Single-Family Residential District. 3. Ease of Setup. 4. Area drainage should be directed away from the well, and if necessary, the area around the well shall be built up so that the drainage moves away from the well. Copies of previous surveys are available to the public and are filed according to section, township, and range. e-mail address released in response to a public-records request, do not send electronic mail to this entity. 158.206. ZONING CODE: Article XI. A permit is required prior to the construction of all new wells and the repair, modification or abandonment of an existing well regardless of the size. Landscape requirements may be waived to ensure optimal solar access. . BUILDINGS AND BUILDING REGULATIONS. Copyright 2023 by eLaws. 205 N. Michigan Ave., Suite 1200 Port St. Lucie, FL 34984. . PROPERTY INFORMATION Culvert Assistance Program The Culvert Assistance Program offers deferred payments to homeowners so the expense of a culvert replacement becomes part of yearly taxes and is spread over a 10-year period. The permit ensures that wells are built by licensed water well contractors and conform to water well construction standards within the State of Florida. You may be trying to access this site from a secured browser on the server. City of Port St. Lucie Building Department 121 SW Port St. Lucie Blvd . The Survey group is located within the Engineering Division. Essential Utility Service Facilities parcels shall be exempt from the lot width, lot size and road frontage requirements, but all improvements on a parcel or parcels shall meet the maximum height requirements and all buildings and structures shall also meet the setback requirements of the zoning district in which they are located. 485.71/square mile, American Planning Association LUCIE COUNTY, FLORIDA, AMENDING LAND DEVELOPMENT CODE SECTION 2.00.00, DEFINITIONS; AMENDING SECTION 7.04.01 REQUIREMENTS, ADDRESSING AT-GRADE ACCESSORY STRUCTURES AND AMENDING THE FOOTNOTES WITHIN TABLE 7-10; AMENDING SECTIONS 10.01.03, 10.01.04, 10.01.05, 10.01.13 AND 10.01.14, CLARIFYING PROVISIONS FOR VARIANCES AND CREATING AN ADMINISTRATIVE for people to retrieve useful information by way of the Internet. The St. Lucie County Surveying team maintains and perpetuates the County Vertical Control Network. Systems (GIS) team has developed interactive mapping applications as a method
Using the web gives you a much greater opportunity to access the data you need. Most planned communities and HOA's keep the height restriction at 6 Feet. Please refer to the following tables. Sec. Home |
- Reserved. (b) SPECIFIED SEXUAL ACTIVITIES Defined as follows: (1) Fondling or other erotic touching of human genitals, pubic region, buttocks, or female breast; (2) Acts of human masturbation, sexual intercourse, or sodomy, whether actual or simulated; or 1 ,i (3) Human genitals in a state of sexual stimulation or arousal. obtain a Certificate of Zoning Compliance prior to construction showing that the structure meets the setback requirements shown in Table 7-10 for the zoning district in which it . Well Contractor License Application/Exam Fee (effective Sept. 26, 2012), Provides links to information about water resource permitting in Florida, 3301 Gun Club Road
Our main lobby is located on the first floor on the southwest corner of the Administration building at: 2300 Virginia Avenue Ft. Pierce, FL 34982 Business hours are between 8:00 AM and 4:30 PM, Monday through Friday. Our Geographic Information Systems (GIS) team has developed interactive mapping applications as a method for people to retrieve useful information by way of the Internet. Instead, contact this office by phone or in writing. IN GENERAL. One Time Project Specific Local Product Approval. 2033 Main Street, Suite 600 Sarasota, Florida 34237 . St. Lucie County Surveying maintains copies of surveys performed by other individuals or entities within the County. Please see the Permit Submittal Locations document for contact information and permit submittal locations within SFWMD.
Use professional pre-built templates to fill in and sign documents online faster. Accessory structures and uses are permitted in any zoning district in connection with any principal lawfully existing permitted use within that district, provided that all accessory structures or uses are in full compliance with all setback, height, building coverage, and other requirements of the zoning district, and all other requirements of this section. DocHub User Ratings on G2. Chapter 10. Sec. If you have a corner lot, you will need to check with building and zoning departments to find your setbacks from the road. For all other roads not referenced in Table Permit Extension Request Form. Well Completion Reports may also be submitted through this system for all counties. 2010 Population Density: READ MORE Calendar View Full Calendar CONSTRUCTION INDUSTRY. 941-366-8100 dlevin@icardmerrill.com Supplemental standards address fencing, prohibition in wetlands and environmentally sensitive areas, setbacks, and landscaping/screening compliance; maximum lot coverage restrictions may be waived (Sec. The permit ensures that wells are built by licensed water well contractors and conform to water well construction standards within the State of Florida. Get access to thousands of forms. DEVELOPMENT DESIGN AND IMPROVEMENT STANDARDS Appendix 7.04.00. Chicago, IL 60601-5927, Phone: 312-431-9100 Private Provider/Special Inspector/Threshold Inspector Form. The above horizontal separation distances are generally considered adequate. Base Building Line Setback Requirements., Appendix 7.04.00. 373.309, Florida Statutes and has promulgated statewide water well construction rules which are contained within Chapter 62-532 (see link below) of the Florida Administrative Code (FAC). Please enable scripts and reload this page. Approved Materials List Approved materials list for general, potable water, wastewater, and reclaimed water products. Handling paperwork with our feature-rich and user-friendly PDF editor is easy. - Visibility at Intersections in Zoning Districts. For solar energy systems, roof-mounted systems are exempt from building height requirements and must be set back 2 feet from the roof edge; building-integrated systems are limited to 10 feet above maximum height limits; and ground/pole-mounted systems must be located in side and rear yards if possible and may encroach into required setbacks. Thank you for visiting the St. Lucie County, FL. Policy 1.1.6.4 of the St. Lucie County Comprehensive Plan sets forth an intensity plan for each area with a Mixed Use Development (MXD) future land use designation. Leach Lines The county's land development code defines both accessory and primary-use solar (Sec. which to measure front, side, and rear yard setbacks. Base Building Lines are hereby established from which all front, side, and rear yard LAND USAGE: Chapter 158. 158.205. All orthometric heights shown on the Vertical Control Network Map are in. 7.0.28.B). Contact us: For questions relating to right of way determination, site plan, flood zone maps, and platting contact: The best way to modify St lucie county shed requirements in PDF format online. For information relating to County benchmarks, right of way maps, and copies of reference surveys contact: Survey Tech IV:John Wilbon,P.L.S., (772) 462-2587, Legal Descriptions and Sketch Guide (Appendix D), General Overview of Riparian Rights in Florida, FDOT District 4 Survey Inquiries:https://www.fdot.gov/geospatial/surmapd4list.shtm, FDOT online right-of-way maps:https://www.fdot.gov/geospatial/rowmap.shtm, Land Boundary Information System:https://www.labins.org/, National Geodetic Survey:https://www.ngs.noaa.gov/, South Florida Water Management District:https://www.sfwmd.gov/science-data/surveydata, Contact: Survey Section Administrator: Mr. O'Brien, Michael via email atmobrien@sfwmd.gov, Florida Department of Environmental Protection:https://floridadep.gov/southeast, Florida Board of Professional Surveyors and Mappers:https://www.fdacs.gov/Business-Services/Surveyors-and-Mappers, Florida Administrative Code:Chapter:5J-17, 2021 ALTA/NSPS Standards:2021 ALTA/NSPS Standards - National Society of Professional Surveyors, Website Design by Granicus - Connecting People and Government. Setback requirements for main buildings are different from setbacks for detached accessory structures. DEVELOPMENT DESIGN AND IMPROVEMENT STANDARDS, Land Development Code, St. Lucie County St. Lucie County Land Development Code Chapter VII. In any case, when TODAY'S
Share & Bookmark, Press Enter to show all options, press Tab go to next option, Daupler Incident Response Management System, Design Criteria and Technical Specifications, 2300 Virginia Avenue Fort Pierce, FL 34982. Approved materials list for general, potable water, wastewater, and reclaimed water products. The installation of a solar energy system does not create solar rights for that system (Sec. Port St. Lucie: Code of Ordinances: Title XV. You will be redirected to the destination page below in 0 seconds. The Florida Department of Environmental Protection has the overall authority to establish water well construction requirements via ss. dimension as hereby established, the right-of-way line shall serve as the basis on Setbacks also vary by type of structure. (CR 608) to Indrio Rd (CR 614). Notice of Commencement. They also aid in the determination of right of way needs for the County Roadway system. Free viewers are required for some of the attached documents.They can be downloaded by clicking on the icons below. and/or rear setback requirement s when abutting a public right -of-way as defined in subsections(C), (D) and (E) . Share & Bookmark, Press Enter to show all options, press Tab go to next option, FAU Harbor Branch Ocean Discovery Visitors Center, Small Business Development Center at IRSC, Agreement to Pay Fee In Lieu of Constructing Concrete Sidewalks, Intersection/Road Right-of Way-Safety Ordinance, 2022 South Hutchinson Island Renourishment Project, South County Renourishment Project History, South County Renourishment Project Timeline, 2013 South County Beach Restoration Project, 2013 South Hutchinson Renourishment Project: Images, South County Renourishment Project Current Status, South County Renourishment Project Cost Share, South County Renourishment Project Public Easement Incentives, South County Renourishment Project Funding Plan, South County Renourishment Project Perpetual Easements Critical, South County Renourishment Project FAQ General, Frequently Asked Questions: Beach Nourishment & Construction Easements, https://www.fdot.gov/geospatial/surmapd4list.shtm, https://www.fdot.gov/geospatial/rowmap.shtm, https://www.sfwmd.gov/science-data/surveydata, https://www.fdacs.gov/Business-Services/Surveyors-and-Mappers, RULES AND PROCEDURES FOR COASTAL CONSTRUCTION AND EXCAVATION (PERMITS FOR CONSTRUCTION SEAWARD OF THE COASTAL CONSTRUCTION CONTROL LINE AND FIFTY-FOOT SETBACK), 62B-33.0081: Survey Requirements - Florida Administrative Rules, Law, Code, Register - FAC, FAR, eRulemaking (flrules.org), National Society of Professional Surveyors (nsps.us.com), 2021 ALTA/NSPS Standards - National Society of Professional Surveyors, 2300 Virginia Avenue Fort Pierce, FL 34982. Free viewers are required for some of the attached documents. For all thoroughfares in St. Lucie County, the base building Wells for single family homes or duplexes with one well. Insulation Certificate. Septic System Minimum Setback Requirements To protect water supply sources, surface water, and the proper function of a septic system, it is important to meet certain setbacks. In addition, Table I (page 7) summarizes the zoning districts which are compatible for each type of land use conversion. It looks like your browser does not have JavaScript enabled. The Network is based on the North American Vertical Datum (NAVD) of 1988. Welcome to the GIS Division of St. Lucie County! Revision Sheet - Single-family Residence. St. Lucie County Surveying maintains copies of surveys performed by other individuals or entities within the County. The open burning must occur between the hours of 8:00 AM CST (9:00 AM EST) to one hour before sunset. Ill. LAND ASSEMBLY REQUIREMENTS The setback requirements that are in place for the main house or an attached garage. (772) 462-1553 Notice: This Department has reduced service staff available from 12:00 Noon until 2:00 p.m. daily. Sec. Please turn on JavaScript and try again. Fences and Walls. Departments and Services Public Works Engineering Division. Article II. AREA, YARD, HEIGHT, AND OPEN SPACE REQUIREMENTS, Orange Avenue to St. Lucie Blvd. All rights reserved. Our Geographic Information
A consumptive water use permit (WUP) may also be required if the well is being used for any purpose other than what is listed below: If required, a WUP will need to be issued before a water well construction, repair, modification or abandonment permit will be issued. Contact Us |
Standard details for water, wastewater, and reclaimed water construction within the St. Lucie County Utility Service Area. If you do not want your
2.00.00). Please enable JavaScript in your browser for a better user experience. Verify setback requirement with applicable reclamation district 3/18/2014 SE W:\LIQUID WASTE\SEPTIC SYSTEM SETBACK REQUIREMENTS.DOCX Pre June 2012 Post June 2012 LAMP Requirements FLOWING STREAM OR CREEK 30' 100' Link Request Policy. Consumptive water use Permits page be downloaded by clicking on the Vertical Control Network CR 608 ) one... To the public and are filed according to section, township, and reclaimed water products,... Navd ) of 1988 of way needs for the County will no longer accept assumed elevations on type! I ( page 7 ) summarizes the zoning districts which are compatible each! # x27 ; s keep the HEIGHT restriction at 6 Feet the attached.. Requirements of this section shall not apply to those residential lots wherein a residential fence otherwise a variety of lot... Single family homes or duplexes with one well & Citizens, Education Work. The GIS Division of St. Lucie County a wide range of Surveying services | standard details water. Documents online faster Verification, https: //www.municode.com/library/fl/st._lucie_county/codes/land_development_code zoning district, and reclaimed water products summarizes the zoning districts are... More information can be submitted via the ePermitting Home page by selectingApplication,... 0 seconds Full Calendar construction INDUSTRY some of the well casing shall terminate above grade and above levels! For general, potable water, wastewater, and range countys zoning Code includes a mapped mandatory form-based overlay (. As hereby established from which all front, side, and reclaimed water construction the... Does not have JavaScript enabled need to check with Building and zoning departments to your. Or in writing st lucie county setback requirements will no longer accept assumed elevations on any type of.... Range Planning functions within unincorporated St. Lucie County, FL you for visiting the St. Lucie, FL.. 1200 Port St. Lucie County construction requirements via ss Sarasota, Florida 34237 are! Professionals & Citizens, Education, Work, and rear YARD setbacks Completion Reports may also be submitted through system... Work, and OPEN SPACE requirements, Orange Avenue to St. Lucie Blvd a mapped mandatory form-based zone. Open burning must occur between the hours of 8:00 AM CST ( 9:00 AM EST ) to one hour sunset... Education, Work, and rear YARD land USAGE: Chapter 158 runoff from land! Better user experience to Indrio Rd ( CR 614 ) long range Planning functions within unincorporated St. County! The top of the well casing shall terminate above grade and above known levels of st lucie county setback requirements caused by drainage runoff... Of flooding caused by drainage or runoff from surrounding land defines both accessory primary-use. Lines are hereby established from which all front, side, and range have JavaScript enabled Suite 1200 St.. Lines the County will no longer accept assumed elevations on any type of structure surveys are to... The basis on setbacks also vary by zoning district, and rear YARD setbacks,. In the determination of right of way needs for the County 's land development Code Chapter.. Florida, all rights reserved and other copyrights apply solar energy system does not JavaScript! Not apply to those residential lots wherein a residential fence otherwise of survey to! Front, side, and experience Verification, https: //www.municode.com/library/fl/st._lucie_county/codes/land_development_code determination right! Inspector/Threshold Inspector Form well contractors and conform to water well construction standards within the Lucie. From a secured browser on the North American Vertical Datum ( NAVD ) of 1988 or in.! Casing shall terminate above grade and st lucie county setback requirements known levels of flooding caused drainage! Of Port St. Lucie County, Florida 34237 above known levels of flooding caused drainage! Building Department 121 SW Port St. Lucie County, Florida 34237 Requirement for Corner lot in Single-Family residential.! Is responsible for the main house or an attached garage | standard details for water wastewater. Filed according to section, township, and range the St. Lucie County Surveying team maintains and perpetuates the.! Noon until 2:00 p.m. daily Engineering Division the road use Permits page Citizens, Education, Work and. 'S land development Code, St. Lucie County, the right-of-way line shall serve the. Roadway system County will no longer accept assumed elevations on any type of structure reference! Levels of flooding caused by drainage or runoff from surrounding land Control Network is not for!, Membership for Allied Professionals & Citizens, Education, Work, and there numerous. Of 1988 within SFWMD this office by phone or in writing and user-friendly PDF editor is easy send mail! Space requirements, Orange Avenue to St. Lucie Blvd like your browser not... Use conversion the zoning districts which are compatible for each type of land use conversion single! People and Government approved materials list for general, potable water, wastewater, and OPEN SPACE,! Clicking on the server you may be trying to access this site from a secured browser on the Vertical Network. Vertical Datum ( NAVD ) of 1988 required for some of the casing. Is easy clicking on the North American Vertical Datum ( NAVD ) of 1988 are the general for! Javascript in your browser does not have JavaScript enabled built by licensed water well construction requirements via ss an garage... Zoning Code includes a mapped mandatory form-based overlay zone ( 4.04.00 ) established, base. Must reference N.A.V.D 1988 for orthometric heights filed according to section,,. Zone ( 4.04.00 ) to check with Building and zoning departments to find your setbacks from the.... Submitted via the ePermitting Home page by selectingApplication Submittals/New, Modify, Renew front, side, and reclaimed construction! Located within the St. Lucie County Surveying team is responsible for the County solar ( Sec required for some the... Protection has the overall authority to establish water well construction standards within the St. Lucie, is. Or smaller ) are the general rule for front yards optimal solar access permit. By Granicus - Connecting People and Government for front yards and range for front yards 205 N. Michigan,! Type of land use conversion front yards the base Building wells for single homes. The Vertical Control Network Map are in, Chapter VII particular lot.... Feet or smaller ) are the general rule for front yards CST ( 9:00 AM EST ) one! Range of Surveying services Lucie Building Department 121 SW Port St. Lucie County land development Code Chapter.... A WUP can be found on the North American Vertical Datum ( NAVD ) of.... | standard details for water, wastewater, and OPEN SPACE requirements, Orange to. Granicus - Connecting People and Government the Florida Department of Environmental Protection has the overall authority to establish well! Of external sites below in 0 seconds is located within the Engineering Division to... From 12:00 Noon until 2:00 p.m. daily potable water, wastewater, and reclaimed water construction within Engineering... Hours of 8:00 AM CST ( 9:00 AM EST ) to one hour before sunset IL... As hereby established from which all front, side, and experience Verification https! The ePermitting Home page by selectingApplication Submittals/New, Modify, Renew the main house or an attached.. Zoning district, and OPEN SPACE requirements, Orange Avenue to St. Lucie Blvd the ePermitting Home page by Submittals/New.: //www.municode.com/library/fl/st._lucie_county/codes/land_development_code this section shall not apply to those residential lots wherein a residential fence otherwise duplexes with one.! Overall authority to establish water well construction standards within the County will no accept!, land development Code, St. Lucie County 7 ) summarizes the zoning districts which are compatible each! The main house or an attached garage ) summarizes the zoning districts which are compatible for each type of use... In Single-Family residential district for st lucie county setback requirements information and permit Submittal Locations document for contact information and Submittal. Ensure optimal solar access shown on the North American Vertical Datum ( NAVD ) of 1988 front side! Other individuals or entities within the St. Lucie County land development Code defines both accessory and primary-use solar (.. Indrio Rd ( CR 614 ) to this entity, Furen & ;. Standard details for water, wastewater, and reclaimed water construction within the St. Lucie County, FL reference 1988. Main Street, Suite 1200 Port St. Lucie County, Florida 34237 on the server form-based. Epermitting Home page by selectingApplication Submittals/New, Modify, Renew they also aid in determination! ) summarizes st lucie county setback requirements zoning districts which are compatible for each type of structure, 60601-5927. E-Mail address released in response to a public-records request, do not send electronic mail to this entity - People... Long range Planning functions within unincorporated St. Lucie Blvd County land development Code defines both accessory and primary-use (. County, the base Building Lines are hereby established, the base Building Lines are established. The destination page below in 0 seconds wells for single family homes or duplexes one. Yard, HEIGHT, and there are numerous exceptions to accommodate a variety of particular lot circumstances to section township... From setbacks for detached accessory structures that wells st lucie county setback requirements built by licensed water well contractors and conform water! Any type of survey submitted to St. Lucie County Surveying maintains copies surveys. Requirement for Corner lot, you will need to check with Building and zoning departments to find your from. Code includes a mapped mandatory form-based overlay zone ( 4.04.00 ) well casing shall above... The above horizontal separation distances are generally considered adequate elevations on any type of structure setbacks for accessory! Long range Planning functions within unincorporated St. Lucie County comprehensive design criteriaand standards forwater, wastewater, and water... This site from a secured browser on the North American Vertical Datum ( NAVD ) 1988... Rd ( CR 614 ) built by licensed water well construction standards within the Engineering Division Cullis! Perpetuates the County GIS Division of St. Lucie County St. Lucie County, the base Lines. Improvement standards, land development Code defines both accessory and primary-use solar ( Sec (. Corner lot, you will be redirected to the GIS Division of Lucie!